Products Case Studies
Electrical OEM Case Study - Harsh and Costly
Customer complaining about how hard it is on assemblers hand and difficult to dispense. Also, complaining about cost. Learn how EIS provides the solution.
Electrical OEM Case Study - Cold Room Needs
Customer requires local cold room, Customer only has a small refrigerator to store all their temperature sensitive materials. EIS was the answer.
Electrical OEM Case Study - RODIA Alternative
RODIA (located in Europe) #2106 material was not meeting specifications upon arriving at the customer. RODIA was unresponsive to the customers problem. Customer was falling behind in their production requirements. EIS provides the solution.
Electrical Apparatus Repair Case Study - Slippery Situation
Various customers had safety issues with drippings from dispensing liquids from various 30 & 55 gallon drum sizes. Drippings on the floor caused a slippery condition when the clay products and red rags used to absorb the drips did not perform as advertised. This calls for another EIS solution.
Electrical OEM Case Study - Stronger Hot Melt
The customer has received complaints from their customers that some of the cases were arriving open with some bottles missing. The customer needs a Hot Melt strong enough that if anybody tries to open up the case to get a bottle out before it arrives to the customer’s final destination that it damages the cases and looks broken into. However, the customer doesn’t want to pay any additional cost for the Hot Melt. Yet again, EIS has the answer.
.gif)